Shared Meters

Step 2 of 4 — Pump, Borehole and Street Lights for 2025-11

Invoice
54,668.62 MT
Total kWh
5,670.000 kWh
Rate
9.641732 MT/kWh
Sharers (exclude exempt)
15 houses
Meter Previous Current kWh (auto) Cost MT (auto)
Pump 528.000 5,090.83
Borehole 0.000 0.00
Street Lights 20.000 192.83
Back

Summary

  • Pump (kWh) 528.000
  • Pump (Cost) 5,090.83 MT
  • Borehole (kWh) 0.000
  • Borehole (Cost) 0.00 MT
  • Street Lights (kWh) 20.000
  • Street Lights (Cost) 192.83 MT
  • Total shared cost 5,283.66 MT
  • Equal share per non-exempt house 352.24 MT

Note: the equal share is applied in the House Readings step (skipping exempt houses like Montego).