Summary
-
Pump (kWh)
554.000
-
Pump (Cost)
5,771.67 MT
-
Borehole (kWh)
0.000
-
Borehole (Cost)
0.00 MT
-
Street Lights (kWh)
0.000
-
Street Lights (Cost)
0.00 MT
-
Total shared cost
5,771.67 MT
-
Equal share per non-exempt house
384.78 MT
Note: the equal share is applied in the House Readings step (skipping exempt houses like Montego).