Shared Meters

Step 2 of 4 — Pump, Borehole and Street Lights for 2025-08

Invoice
55,754.96 MT
Total kWh
5,850.000 kWh
Rate
9.530762 MT/kWh
Sharers (exclude exempt)
15 houses
Meter Previous Current kWh (auto) Cost MT (auto)
Pump 908.000 8,653.93
Borehole 0.000 0.00
Street Lights 0.000 0.00
Back

Summary

  • Pump (kWh) 908.000
  • Pump (Cost) 8,653.93 MT
  • Borehole (kWh) 0.000
  • Borehole (Cost) 0.00 MT
  • Street Lights (kWh) 0.000
  • Street Lights (Cost) 0.00 MT
  • Total shared cost 8,653.93 MT
  • Equal share per non-exempt house 576.93 MT

Note: the equal share is applied in the House Readings step (skipping exempt houses like Montego).