Summary
-
Pump (kWh)
908.000
-
Pump (Cost)
8,653.93 MT
-
Borehole (kWh)
0.000
-
Borehole (Cost)
0.00 MT
-
Street Lights (kWh)
0.000
-
Street Lights (Cost)
0.00 MT
-
Total shared cost
8,653.93 MT
-
Equal share per non-exempt house
576.93 MT
Note: the equal share is applied in the House Readings step (skipping exempt houses like Montego).