Shared Meters

Step 2 of 4 — Pump, Borehole and Street Lights for 2025-10

Invoice
56,258.14 MT
Total kWh
5,400.000 kWh
Rate
10.418174 MT/kWh
Sharers (exclude exempt)
15 houses
Meter Previous Current kWh (auto) Cost MT (auto)
Pump 554.000 5,771.67
Borehole 0.000 0.00
Street Lights 0.000 0.00
Back

Summary

  • Pump (kWh) 554.000
  • Pump (Cost) 5,771.67 MT
  • Borehole (kWh) 0.000
  • Borehole (Cost) 0.00 MT
  • Street Lights (kWh) 0.000
  • Street Lights (Cost) 0.00 MT
  • Total shared cost 5,771.67 MT
  • Equal share per non-exempt house 384.78 MT

Note: the equal share is applied in the House Readings step (skipping exempt houses like Montego).